Time control. It is quite common that the
You do not have permission to view link Войдите или зарегистрируйтесь.
maker will send a bi-weekly report with detailed progress regarding the mold manufacturing. You may want to look only that the first trial, T1, is as promised, but you may also want to monitor the progress to predict delays. For that, you may need a professional who has a deep understanding of the steps of mold manufacturing.
Regroup and start preparing for T1. We have the time to look back into our plans and check if we covered all bases, if we defined all we wanted to, and if we covered operation issues such as raw materials for the testing, as well as double checking that the mold maker has the latest part drawings, etc.
I’ll explain how I see the difference between T0 and T1.

The first stage before injection of the plastic that will form into parts is to see that the mold works. This is what I call T0. This is the first time the mold maker mounts the mold on the injection machine and sees that the moving elements move well, that the plastic melt flows well, that the cooling performs, and more. Just like every car manufacturer will have a “dry run” of the car before it is driven out of the assembly hanger, the mold maker should ensure this machine performs its basic functions before handing samples for examining.

If the mold performs well in T0, then this test can be called T1 because we have samples. However, T1 samples might not (or, in some predefined cases, should not) be within the final dimensions; the surface finish is not final; and we may have visual marks, flashes, and mismatches. That being said, the samples are a milestone with two main aspects: one is that the mold maker delivered a mold — a tool, a machine — that can produce the parts we had up until now only as a CAD file, 2D drawings, and models. The other is that the developer gets the queue to initiate the final stage of the product development, what we call the “T1 to T-final” (the well-known Tf) phase, which is the “money time” of our project.

To clarify, this stage is not a
You do not have permission to view link Войдите или зарегистрируйтесь.
process validation (installation qualification, operational qualification, performance qualification). This is the stage in which we aim to achieve a verified, stable part that will qualify our definitions. Once we get that, we may initiate mold performance validation.
 